Screen a site against live DNO data in 60 seconds, solar, battery, heat pump, EV or wind, get a PURSUE / CAUTION / AVOID verdict, then generate and submit the G98/G99 pack the same day. No bureau.
For any job that touches G99, battery, commercial, or a constrained network, the DNO approval happens after the sale: weeks of limbo, sometimes a "no." That's the #1 blocker installers name, whatever the technology.
From a postcode to a lodged application, at the kitchen table.
Live grid capacity and a cited verdict. Free, unlimited.
The pack knows your site. Complete the gaps and go.
No bureau, no weeks of waiting to start.
Design platforms draw a beautiful system, then leave the installer to find out, weeks later, whether the grid will even allow it. Headroom is the layer that closes the loop.
Keep your design tool. Headroom sits alongside it and owns the grid-connection step that actually blocks deployment, at a fraction of the cost of the thing design tools don't do at all.
UKPN capacity, ECR queue and PVGIS yield. The source is cited on every verdict.
EREC G98 / G99 Issue 2 / G100-aware, and UK GDPR compliant throughout.
Every recorded DNO outcome sharpens future verdicts. Data no competitor has.